A challenging project: heavy and waxy oils produced from 31 drilling pads, (with some of them located in a national park) and treated in a Production Center of 200,000bopd oil capacity and 650,000 bld of water treatment capacity.
Specific focus on ICSS, ESD and F&G systems.
Ensure all pre-commissioning and commissioning execution activities are carried out safely and in accordance with the project HSE plan.

